
Badger Street Mall Concrete Project
Check out this before and after shot of the new Badger Street mall renovation on the UW-La Crosse campus. The Borton concrete crew pushed through the sweltering summer heat to complete this new 20-foot wide concrete walkway that stretches nearly a fifth of a mile and needed around 750 yards of concrete. The crew showcased their craftsmanship by giving the concrete a picture frame style of finish. The walkway includes two 50-foot wide radius areas complete with brick pavers, over fifty new bike stations, twelve flag poles, and many other connecting walkways. Great job crew!
Please Share Me On
View All Posts
Latest Posts
Rockford University Food Court
16 days ago
Rockford University
1 month ago
Cannery Trails Update
1 month ago
Shade Haven
1 month ago
Mulligan's at the La Crosse Country Club
1 month ago
Featured Posts
Rockford University Food Court
16 days ago
Rockford University
1 month ago
Cannery Trails Update
1 month ago
Shade Haven
1 month ago
Mulligan's at the La Crosse Country Club
1 month ago